Request Electrical Permit

Please fill out the below information for your electrical projects and click submit at the bottom.

REMI electrical permit application form

Are you the agent of the owner?
Yes
No
I am the owner

A copy of this application form will be emailed to the email address that is entered here.

Select from the drop down menu the location type for this electrical project

sps316.012 Permits are required for an electrical project at any of the following locations: 1. A farm. 2. A public building, structure, or premises. 3. A place of employment. 4. A campground. 5. A manufactured home community / mobile home park. 6. A public marina, pier, dock, or wharf. 7. A recreational vehicle park. or 8. other location per Municipal ordinance.

Example: office at 1316 N 14th Street, room 200 or if there is no address then provide directions to the location, other helpful landmarks, general contractor, etc.

SPS 316.013(3)(a)(a) The building owner or their agent shall notify the inspection agency to provide electrical inspections when the electrical wiring installation is ready for inspection.

State Statute 101.862  License or registration required. No person may engage in the business of installing, repairing, or maintaining electrical wiring unless the person is licensed as an electrical contractor by the department. No person may install, repair, or maintain electrical wiring unless the person is licensed as an electrician by the department or unless the person is enrolled as a registered electrician by the department.

State Statute 101.862  License or registration required.  No person who is not a master electrician may install, repair, or maintain electrical wiring unless a master electrician is at all times responsible for the person’s work.

Examples: wiring up a new building, alterations to wiring in an existing building, adding a new subpanel, upgrading the service equipment, adding an outlet, installing low voltage cabling, etc. SPS316.003 A wiring installation is a new, reconstructions, alterations, extensions to an electrical system.

Example: Temp service, upgraded service, permanent service, fire pump service, single phase service, three phase service, car charger service, line side tap to service meter, etc.

Example: A main lug only service panel with 4 total service disconnects would be 3 additional disconnects.

A feeder is all circuit conductors between the power source and the final overcurrent device.

A branch circuit is the circuit conductors between the final overcurrent device protecting the circuit and outlet.

Each array is a mechanically integrated assembly of modules or panels on a roof or support structure and foundation, tracker, and other components, as required, to form a single ac power production unit. Don't forget to add a feeder from the array output supply source conductors to a combiner panel and a feeder to the line or load side tap or device.

Each array is a mechanically integrated assembly of modules or panels on a roof or a support structure and foundation, tracker, and other components, as required, to form a single dc power production unit to a single inverter. Don't forget to add a feeder from the inverter output circuit to the PV disconnect at the line or load side tap or device.

Don't forget to add a feeder from the inverter output circuit to the disconnect of line or load side tap or device.

By entering my name below, I agree that this constitutes my legally binding signature for the purpose of submitting this permit application. I understand that this permit will become null and void if any information is found to be fraudulent and any paid fees are forfeited. I understand that this application is only for the scope of work described above. I understand that I am responsible for any additional scope of work, and I will pay for those additional fees. I agree to conform to all applicable laws of the State of Wisconsin and to the local authority having jurisdiction.

Drawing mode selected. Drawing requires a mouse or touchpad. For keyboard accessibility, select Type or Upload.
bottom of page